The wind grew noticeably stronger as soon as I reached the steep ridge up to Oyama. I spoke with two hikers, descending toward me, from Osaka Prefecture (pictured) who told me, “We arrived in Tateyama yesterday and climbed from Raichozawa to spend the night at Tsurugi-gozen hut. This morning, we traversed Bessan, Masago-dake, Fuji-no-oritate, Onanji-yama, and Oyama. The scenery was incredible—it was a fantastic hike!”
[Ichinokoshi to Sannokoshi]
This view shows the entire route from Ichinokoshi Sanso (pictured. foreground) to the summit office of Oyama Shrine (pictured, upper right). The ascent is marked in red and the descent in yellow, keeping hikers traveling in opposite directions on separate lines and preventing bottlenecks where they pass. The standard climbing time for this section is one hour.
[Ichinokoshi Sanso]
Although the separated routes made it possible to climb at my own pace, this was still a demanding section, with a steep gradient and loose rocks underfoot. I continued upward carefully, conscious of the risk of falling, injuring a hand while trying to catch myself, or dislodging rocks that could endanger people below. At one point, shouts went up that someone had been injured, and a Toyama Prefectural Police mountain rescue helicopter was called to the scene.
[Ichinokoshi to Sannokoshi]
Reaching the broad scree slope at Sannokoshi (pictured) brought a welcome sigh of relief. The summit office of the Oyama Shrine (pictured, upper right) stood directly ahead, while to the right, breaks in the clouds revealed Mt. Yari, the Hotaka Range, and the ridgelines of both the Omote Ginza and Ura Ginza routes. After catching my breath, I prepared for the steep final push to the summit of Mt. Oyama. (Continued in Mt. Oyama, Pt. 3.)
[Sannokoshi to Mt. Oyama]
*The annual water discharge is scheduled to continue through 10/15 (Thu.), although it may be suspended due to weather or other operational conditions.
[Kurobe Dam]
*Place … Omachi City, Nagano Prefecture; Tateyama Town, Toyama Prefecture
*Opening Period … April 15, 2026 – November 30, 2026
*Fees … Kanden Tunnel Electric Bus (Ogizawa – Kurobe Dam) Round-trip adults JPY3,200, elementary school students JPY1,600
[Tateyama Kurobe Alpine Route]
*Place … Omachi City, Nagano Prefecture; Tateyama Town, Toyama Prefecture
*Opening Period … April 15, 2026 – November 30, 2026
*Parking lot on the Ogizawa Station side … Passenger cars JPY1,000 / 12hours (*Free parking is also available)
*Transportation costs from Ogizawa to Tateyama Station … adults JPY10,940, elementary school students JPY5,480
*Request for the original data of our photographs
reported by Snownavi